• NEXUS6
    #296
    Az első BWR reaktorokat a GE és a Westinghouse az U.S. Navy megrendelésére fejlesztette ki.
    "The BWR concept was developed slightly later than the PWR concept. Development of the BWR started in the early 1950s, and was a collaboration between General Electric (GE) and several US national laboratories.

    Research into nuclear power in the US was led by the 3 military services. The Navy, seeing the possibility of turning submarines into full-time underwater vehicles, and ships that could steam around the world without refueling, sent their man in engineering, Captain Hyman Rickover to run their nuclear power program."
    Wiki

    A csernobili erőmű tekintetében viszont ezexerint egyetértünk.