• pipaxy
    #216
    Az iter.org-ról:
    Challenge 7 - economic viability - incorporates the solutions adopted to resolve all the other challenges. Assuming plant capital cost scales with the tokamak volume, one can expect DEMO capital costs in the region of 14 /We based on the cost estimates for ITER. Those of PROTO will then be typically 8 /We and, with economies of series production of fusion plants subsequently, capital costs could reduce to ~ 4 /We. This should be compared to today's fission and coal plants at ~ 3 /We and 1.5 /We respectively. However, the capital costs of today's coal plants do not include costs to mitigate environmental damage, nor do any of the above costs include the fuel, operating and decommissioning costs, which for coal are typically comparable to the capital costs and should be lowest for fusion.

    Tehát véleményük szerint néhány évtized múlva 4 euro/wattos fajlagos beruházási költséggel fognak majd kereskedelmi fúziós erőműveket építeni. Ez az ő asztaluk, ezt ők tudják.
    De hogy a fissziós erőműveknél 3 euro/watt, az kicsit túlzás. A legdrágább, földrengéses területre tervezett erőműnél lehet, de nem ez az általános. Itt azt írják, hogy a Finnországba tervezett atomerőmű 1.75 euro/wattos áron épülhetne meg, de a lapon látni még 1$/wattos árakat is.(!)
    És persze azt se feltételezhetjük, hogy az elkövetkező évtizedekben a fejlesztések következtében ne mennének még lejjebb az atomenergia árai.

    Érdekes.